What is the purpose of a Stakeholder Register and how is it used? How can a project manager incorporate this tool into controlling the project?
The assignment is to answer the question provided above . This is to be in narrative form and should be as thorough as possible. Bullet points should not to be used. The paper should be at least 1.5 – 2 pages in length, Times New Roman 12-pt font, double-spaced, 1 inch margins and utilizing at least five outside scholarly or professional source. The textbook should also be utilized. Do not insert excess line spacing. APA formatting and citation should be used.
What is the purpose of a Stakeholder Register and how is it used? How can a pro
By admin